Test procedure for butt weld end valve
I would like to know the shop procedure for hydrostatic test butt weld end valve as per API 598. This procedure should be more difficult than flange end valve. Do the manufacturer weld and cut the spool after pressure testing? Do they carry out PWHT after testing low alloy steel valve body? Anyone who has experience in valve factory please advise me.
In general a test bung with an 'O' Ring is used and the bungs on both
ends of the valves are clamped together before applying pressure. This
is very effective and proven methodology.
Also, for buttweld end
valve, since radiography is mandatory the standard allows you to offer
them as special class valves with higher working pressure. Refer ASME
B16.34
This is the information I got from a hectic web search.Hope it helps!
INSPECTION AND TESTING:-
For a individual valve to be pressure tested to API 598/BS 6755 Part 1 requirements are:-
TEST PRESSURES FOR STANDARD VALVES
ASME * Hydrostatic test pressure
CLASS
Shell BackSeat Closure
150 psig 450 315 315 100
kg/cm? 32 22 22 7
300 psig 1125 815 815 100
kg/cm? 79 57 57 7
600 psig 2225 1630 1630 100
kg/cm? 156 115 115 7
The last column values are for pneumatic low pressure closure test.
Low pressure test for Swing Check valves:
In
addition to the high pressure closure test, Swing Check valves are
subjected to low pressure hydrostatic closure test at a pressure of 25%
of the high pressure closure test The duration of the test is the same
as for the high pressure closure test.